Construction Photo Album – Arizona ApproachClick on any thumbnail to view an enlarged version of that photo. Please note that you will need to use the Back button on your browser to return to this page. If you prefer a higher resolution image (300 dpi or more), you can also download these from our site using the High Resolution link located below each thumbnail. Please note that these higher resolution images (which are provided in TIF format) will take longer to download. |
|||
|
The Arizona Approach Place your mouse on the Project Overview Map to see the Arizona Approach highlighted. |
|||
|
Quick Jump: |
|||
| November 2004 | August 2004 | May 2004 | February 2004 |
| October 2004 | July 2004 | April 2004 | January 2004 |
| September 2004 | June 2004 | March 2004 | October/November 2003 |
| The Beginnings of a Bypass | |||
|
Images from November 2004 Sugarloaf Mountain Bridge is completed! |
|||
|
Looking to the South – Vastco Inc. placing concrete High Resolution TIF (14 MB) |
Looking Southwest at Vastco Inc. placing concrete to construct the final section of bridge deck on the Sugarloaf Mountain Bridge. High Resolution TIF (14 MB) |
||
|
Looking to the East – A view of the completed High Resolution TIF (14 MB) |
Looking Southeast, from Abutment 1, at High Resolution TIF (14 MB) |
||
|
Looking to the South – A view of the new US 93 alignment,
High Resolution TIF (14 MB) |
|||
|
Images from October 2004 Sugarloaf Mountain Bridge nearly complete… |
|||
|
Looking to the South – a view of the Sugarloaf Mountain Bridge and Interim US 93 High Resolution TIF (14 MB) |
Looking South at the new alignment of US 93 from Station 231+00 to the end of the project. High Resolution TIF (14 MB) |
||
|
Images from September 2004 Arizona Approach at 98% Complete… |
|||
|
Looking to the South High Resolution TIF (14 MB) |
High Resolution TIF (14 MB) |
||
|
Dust palliative, Lignin Sulfonate applied to roadway. High Resolution TIF (14 MB) |
|||
|
Images from August 2004 Progress Continues |
|||
|
Looking at Pier #6 and Abutment #2 of the Sugarloaf Mountain Bridge. R.E. Monks excavating grouted riprap waterway in foreground. High Resolution TIF (14 MB) |
Looking back on line at new alignment of US 93 from Sugarloaf Mountain TI OP Bridge. High Resolution TIF (14 MB) |
||
|
Looking back on line from end of project at new alignment of US 93.
High Resolution TIF (14 MB) |
|||
|
Images from July 2004 Completing the connection…the Sugarloaf Mountain Bridge |
|||
|
Installation of Settlement Instruments at High Resolution TIF (14 MB) |
|||
|
Foreground: Casino Ready Mix Batch
Plant High Resolution TIF (14 MB) |
Foreground: Sugarloaf Mountain Bridge High Resolution TIF (14 MB) |
||
![]() Sugarloaf Mountain Bridge – Looking North |
![]() Close-up of the Sugarloaf Mountain Bridge |
||
|
Foreground: Arizona Approach High Resolution TIF (14 MB) |
|||
|
Images from June 2004 Summer Heat Won’t Stop Construction on the Sugarloaf Mountain Bridge. |
|||
|
Looking to the north, this photo shows the Sugarloaf Mountain Bridge
in the background High Resolution TIF (14 MB) |
|||
|
Royden and Jakes Crane setting girders for Span #7, Sugarloaf Mountain Bridge. High Resolution TIF (14 MB) |
Foreground: Sugarloaf
Mountain Bridge, with a Liebherr 360-Ton Crane High Resolution TIF (14 MB) |
||
![]() Setting girders for Span #7 Sugarloaf
Mountain Bridge High Resolution TIF (14 MB) |
|||
|
Images from May 2004 Setting the Formwork on the TIOP Bridge… |
|||
![]() Looking East – View 1 |
|||
|
Vastco, Inc. setting formwork for the deck of the TIOP Bridge. |
|||
|
High Resolution TIF (View 1) (14 MB) |
High Resolution TIF(View 2) (11 MB) |
||
![]() Looking Northwest Vasco Inc. forming
the deck for the TIOP Bridge. |
|||
![]() Looking Northwest R.E. Monks placing roadway
embankment from US 93 Mainline Station 229+60 through Station
239+00. Sugarloaf Mountain Bridge in background. |
High Resolution TIF (14 MB) |
||
|
Images from April 2004 Pouring the Concrete Deck of the Sugarloaf Mountain Bridge |
|||
![]() Top
left: Sugar Loaf Mountain Bridge, Spans #1-#6 in place.
Vastco, Inc. has completed placement of the concrete deck for Span
#2 & #3. |
Middle Right: Span 6 of the Sugar Loaf
Mountain Bridge High Resolution TIF (14 MB) |
||
![]() Vastco, Inc. placing concrete for Span #3 deck of the Sugar Loaf Mountain Bridge High Resolution TIF (14 MB) |
![]() View of the TIOP Bridge. Vastco, Inc. has completed Abutment #1& #2 and is preparing to set girders. High Resolution TIF (14 MB) |
||
|
Images from March 2004 Setting the girders for Span #2 on the Sugarloaf Mountain Bridge |
|||
![]() Vastco Inc. sets the girders for Span #2 – View #1 High Resolution TIF (14 MB) |
![]() View #2 High Resolution TIF (14 MB) |
||
![]() View #3 High Resolution TIF (14 MB) |
![]() View #4 High Resolution TIF (14 MB) |
||
|
Images from February 2004 One Year from the Start of Construction… |
|||
The foreground shows a view of the embankment operation for Abutment #2 (Stations 229+00 – 235+00)and in the background you can see the excavation operation from Station 244+00 to 248+00. High Resolution TIF (14 MB) |
![]() This view shows Pier cap #1 concrete pour on the Sugarloaf Mt. Bridge. (Station 221+55) High Resolution TIF (14 MB) |
||
![]() Interim 93. Excavation operations for the future US 93 continues. (Stations 242+00 – 250+00) High Resolution TIF (14 MB) |
![]() The Sugarloaf Mountain Bridge. This photo shows a view of Stations 220+00 – 228+00. High Resolution TIF (14 MB) |
||
![]() View of the proposed Colorado River Bridge alignment, taken from US 93, Station 177+50. This view is looking from Abutment 1 on the Nevada side to Abutment 2 on the Arizona. High Resolution TIF (14 MB) |
|||
|
Images from January 2004 Excavation & Embankment Operations Underway |
|||
|
Sugarloaf Mountain Bridge High Resolution TIF (14 MB) |
![]()
Sugarloaf Mountain Bridge & High Resolution TIF (14 MB) |
||
![]()
Cat 5110 Excavator loading High Resolution TIF (14 MB) |
![]()
Hydraulic Scaling of Cut Slopes
|
||
|
Images from October/November 2003 Beginning Construction on the Sugarloaf Mountain Bridge |
|||
![]() Sugarloaf Mountain Bridge Setting Girders, Span #6 High Resolution TIF (24 MB) |
![]() Sugarloaf Mountain Bridge Setting Girders, Span #6 High Resolution TIF (24 MB) |
||
|
Sugarloaf Mountain Cut Station 204+00 CL (Looking ahead on line) High Resolution TIF (24 MB) |
![]() Sugarloaf Mountain Cut Station 214+00 RT (Looking back on line) High Resolution TIF (24 MB) |
||
|
The Beginnings of a Bypass |
|||
|
|
|
||
|
From the ground up…building the Sugarloaf Mountain Bridge |
|||
|
|
|
||
|
|
![]() Sugarloaf Mountain Bridge Pier #6 (Looking Northwest) (High Resolution image not available at this time.) |
||
|
A Bird’s Eye View |
|||
|
|
|
||