Construction Photo Album - Arizona Approach
Click on any thumbnail to view an enlarged
version of that
photo.
Please note that you will need to use the Back button on your
browser to return to this page. If you prefer a
higher resolution image (300 dpi or more), you can also download these from our
site using the High Resolution link located below each thumbnail.
Please note that these higher resolution images (which are provided
in TIF format) will take longer to download.
|
The Arizona Approach

Place your mouse on the Project
Overview Map to see the Arizona Approach highlighted.
|
Quick Jump: |
|
|
|
November 2004 |
August 2004 |
May 2004 |
February 2004 |
October 2004 |
July 2004 |
April 2004 |
January
2004 |
September 2004 |
June 2004 |
March 2004 |
October/November 2003 |
|
|
|
The Beginnings of a Bypass |
|
|
|
|
Images from November 2004
Sugarloaf Mountain Bridge is
completed! |

Sugarloaf Mountain Bridge
Looking to the South - Vastco Inc. placing concrete
to construct the final section of bridge deck on the
Sugarloaf Mountain Bridge.
High Resolution TIF (14 MB)
|

Sugarloaf Mountain Bridge
Looking Southwest at Vastco Inc. placing concrete to construct the
final section of bridge deck on the Sugarloaf Mountain Bridge.
High Resolution TIF (14 MB) |

Sugarloaf Mountain Bridge - Completed
Looking to the East - A view of the completed
Sugarloaf Mountain Bridge looking towards
Abutment 1, including the new Bureau of
Reclamation sewer pond access road.
High Resolution TIF (14 MB)
|

Sugarloaf Mountain Bridge - Completed
Looking Southeast, from Abutment 1, at
the completed Sugarloaf Mountain Bridge.
High Resolution TIF (14 MB) |

New US 93 Alignment
Looking to the South - A view of the new US 93 alignment,
Arizona interchange, associated ramps, and
Interim US 93 alignment.
High Resolution TIF (14 MB)
|
Return to top of page |
Images from October 2004
Sugarloaf Mountain Bridge nearly
complete... |

Sugarloaf Mountain Bridge
Looking to the South - a view of the Sugarloaf Mountain Bridge and
Interim US 93
High Resolution TIF (14 MB)
|

Sugarloaf Mountain TI OP Bridge
shown in upper left corner.
Looking South at the new alignment of US 93 from Station 231+00 to
the end of the project.
High Resolution TIF (14 MB) |
Return to top of page |
Images from September 2004
Arizona Approach at 98% Complete... |

Wildlife Ramp for Bighorn Sheep
Looking to the South
High Resolution TIF (14 MB)
|

Looking back at reinforcing steel for Span #7 on Sugarloaf
Mountain Bridge.
High Resolution TIF (14 MB) |

Looking back on line from end of project
to the Sugarloaf Mountain Bridge
Dust palliative, Lignin Sulfonate applied to roadway.
High Resolution TIF (14 MB)
|
Return to top of page |
Images from August 2004
Progress Continues |

Abutment #2 of Sugarloaf Mountain Bridge
Looking at Pier #6 and Abutment #2 of the Sugarloaf
Mountain Bridge. R.E. Monks excavating grouted riprap waterway in
foreground.
High Resolution TIF (14 MB)
|

Looking back on line at new alignment of US 93 from Sugarloaf
Mountain TI OP Bridge.
High Resolution TIF (14 MB) |

New US 93 Alignment
Looking back on line from end of project at new alignment of US 93.
Aggregate base course being placed on grade.
High Resolution TIF (14 MB) |
Return to top of page |
Images from July 2004
Completing the connection...the
Sugarloaf Mountain Bridge |

At work on Abutment #2
Installation of Settlement Instruments at
Abutment No. 2 of the Sugarloaf
Mountain Bridge.
High Resolution TIF (14 MB)
|

Looking North at an aerial view of the new alignment of US 93 and Interim 93. Foreground: Casino Ready Mix Batch
Plant
Background: Sugarloaf Mountain Bridge
High Resolution TIF (14 MB) |

Looking South at an aerial view of the new US 93 alignment and
Interim 93. Foreground: Sugarloaf Mountain Bridge
High Resolution TIF (14 MB) |

Sugarloaf Mountain Bridge - Looking North |

Close-up of the Sugarloaf Mountain Bridge |

Aerial view of the site of the future Colorado River Bridge.
Foreground: Arizona Approach
Background: Nevada Approach
High Resolution TIF (14 MB)
|
Return to top of page |
Images from June 2004
Summer Heat Won't Stop
Construction on the Sugarloaf Mountain Bridge. |

Overall view of project.
Looking to the north, this photo shows the Sugarloaf Mountain Bridge
in the background
and the TIOP Bridge in the foreground. Slopes and subgrade being
finished by R.E. Monks Construction.
High Resolution TIF (14 MB)
|

Looking South from Pier #6 towards Abutment #2. Royden and
Jakes Crane setting girders for Span #7, Sugarloaf Mountain Bridge.
High Resolution TIF (14 MB) |

Vastco, Royden and Jakes Crane
setting girders for Span #7. Foreground: Sugarloaf
Mountain Bridge, with a Liebherr 360-Ton Crane
Background: American 225-Ton Crane
High Resolution TIF (14 MB) |

Setting girders for Span #7Sugarloaf
Mountain Bridge
High Resolution TIF (14 MB) |
Return to top of page |
Images from May 2004
Setting the Formwork on the TIOP Bridge... |

Looking East - View 1 |

Looking East - View 2
|
Vastco, Inc. setting formwork for the deck of
the TIOP Bridge.
|
High Resolution TIF (View 1) (14 MB) |
High Resolution TIF(View 2) (11 MB) |

Looking Northwest Vasco Inc. forming
the deck for the TIOP Bridge.
High Resolution TIF (12 MB) |

Looking NorthwestR.E. Monks placing roadway
embankment from US 93 Mainline Station 229+60 through Station
239+00. Sugarloaf Mountain Bridge in background.
High Resolution TIF (12 MB) |

Looking Northwest
Sugarloaf Mountain Bridge and the roadway embankment being placed
for Mainline US 93 Station 229+50 through Station 239+00.
High Resolution TIF (14 MB) |
Return to top of page |
Images from April 2004
Pouring the Concrete Deck of the Sugarloaf Mountain Bridge |
 Top
left: Sugar Loaf Mountain Bridge, Spans #1-#6 in place.
Vastco, Inc. has completed placement of the concrete deck for Span
#2 & #3.
Middle of Picture: R.E. Monks continues to excavate new
alignment for US 93 (Stations 242+50 - 251+00)
Bottom: Girders stockpiled for TIOP Bridge.
High Resolution
TIF (12 MB) |

Project Overview
Middle Right: Span 6 of the Sugar Loaf
Mountain Bridge
Middle: R.E. Monks excavating and placing embankment
(Stations 229+60 - 255+00)
High Resolution TIF (14 MB) |

Vastco, Inc. placing concrete for Span #3 deck
of the Sugar Loaf Mountain Bridge
High Resolution
TIF (14 MB) |

View of the TIOP Bridge. Vastco, Inc. has completed Abutment
#1& #2 and is preparing to set girders.
High Resolution TIF (14 MB) |
Return to top of page |
Images from March 2004
Setting the girders for Span #2 on the
Sugarloaf Mountain Bridge |

Vastco Inc. sets the girders
for Span #2 - View #1
High Resolution
TIF (14 MB) |

View #2
High Resolution TIF (14 MB) |

View #3
High Resolution TIF (14 MB) |

View #4
High Resolution TIF (14 MB) |
Return to top of page |
Images from February 2004
One Year from the Start of Construction... |
The foreground shows a view of the embankment
operation for Abutment #2 (Stations 229+00 - 235+00)and in the
background you can see the excavation operation from Station 244+00
to 248+00. High
Resolution TIF (14 MB) |

This view shows Pier cap #1 concrete pour on the
Sugarloaf Mt. Bridge. (Station 221+55)
High Resolution
TIF (14 MB) |

Interim 93. Excavation operations for the
future US 93 continues. (Stations 242+00 - 250+00)
High Resolution
TIF (14 MB) |

The Sugarloaf Mountain Bridge.
This photo shows a view of Stations 220+00 - 228+00.
High Resolution
TIF (14 MB) |

View of the proposed Colorado River Bridge
alignment, taken from US 93, Station 177+50. This view is
looking from Abutment 1 on the Nevada side to Abutment 2 on the
Arizona. High
Resolution TIF (14 MB) |
Return to top of page |
Images from
January
2004
Excavation & Embankment Operations Underway |

Sugarloaf Mountain Bridge
Excavation &
Embankment Operations
(Looking South from the Contractors Yard
at the Traffic Switch to Interim Hwy 93)
High Resolution TIF (14 MB) |

Sugarloaf Mountain Bridge &
Embankment Operations
(Looking back
on line at Interim
Hwy 93 - Station 246+00)
High Resolution TIF (14 MB) |

Cat 5110 Excavator loading
Cat 773 Rock Truck
(Station 248+00)
High Resolution TIF (14 MB) |

Hydraulic Scaling of Cut Slopes
(Station 247+00 Left)
High Resolution TIF (14 MB)
|
Return to top of page |
Images from October/November 2003
Beginning Construction on the Sugarloaf Mountain Bridge |

Sugarloaf Mountain Bridge
Setting Girders, Span #6
High Resolution TIF (24 MB) |

Sugarloaf Mountain Bridge
Setting Girders, Span #6
High Resolution TIF (24 MB) |

Sugarloaf Mountain Cut
Station 204+00 CL
(Looking ahead on line)
High Resolution TIF (24 MB) |

Sugarloaf Mountain Cut
Station 214+00 RT
(Looking back on line)
High Resolution TIF (24 MB) |
Return to top of page |
The Beginnings of a Bypass |

Stabilization of Rock Block #1 on the upper wall of Black
Canyon, Arizona. Monks/Vastco (General Contractor),
Yenter (Subcontractor).
High Resolution TIF (6 MB)
|

Monks/Vastco conducting excavation at
mainline US 93, station 218+50 (left).
Background: A CAT 5110 excavator and a fleet
of CAT 773 haul trucks are used to haul embankment material.
Foreground: Monks uses a CAT 245B with a ram hoe to reduce oversized
material for placement into embankment fill.
High Resolution TIF (6 MB)
|
From the ground
up...building the Sugarloaf Mountain Bridge |

Monks/Vastco constructing Piers 5 and 6 (left) of Sugarloaf Mountain Bridge.
High Resolution TIF (6 MB)
|

Arial view of the Sugarloaf Mountain Bridge
construction. From left to right, Piers 4, 5, and 6.
High Resolution TIF (6 MB)
|

Vastco's 250-ton Link Belt crane with 200-feet of boom,
was used to construct the Sugarloaf Mountain Bridge.
High Resolution TIF
(6 MB)
|

Sugarloaf Mountain Bridge Pier #6
(Looking Northwest)
(High Resolution image not available
at this time.) |
A Bird's Eye View |

Arial view of the Arizona Approach
(Looking from South to North)
High Resolution TIF (6 MB)
|

Arial view of the northern section of the Arizona
Approach, including the Sugarloaf Mountain Bridge piers in the
foreground and mainline US 93 excavation from station 200+00 through
219+50 in the background.
High
Resolution TIF (6 MB)
|
|
Return to top of
page |
|