Construction Photo Album - Nevada Approach
Click on any thumbnail to view an enlarged
version of that
photo.
Please note that you will need to use the Back button on your
browser to return to this page. If you prefer a
higher resolution image (300 dpi or more), you can also download these from our
site using the High Resolution link located below each thumbnail.
Please note that these higher resolution images (which are provided
in TIF format) will take longer to download.
|
Quick Jump: |
|
|
|
December 2004 |
September 2004 |
June 2004 |
March 2004 |
November 2004 |
August 2004 |
May 2004 |
February 2004 |
October 2004 |
July 2004 |
April 2004 |
January
2004 |
|
|
|
November 2003 |
|
|
|
|
Images from December 2004
The Canyon
Bridge
takes shape...
|

Nevada Interchange
(looking west)
View of the Nevada Interchange and associated ramps, including the Hoover Dam
Interchange Bridge (Structure H-2699).
High Resolution TIF (14 MB)
|

Hoover Dam Canyon Bridge
(looking east)
Foreground: Edward Kraemer & Sons constructing
formwork for Abutment 1 of the Hoover Dam
Canyon Bridge
(Structure H-2700).
Center: View of the completed Pier 1 of the Hoover Dam Canyon
Bridge.
Background: View of the rock excavation and Abutment 2
location of the Hoover Dam Canyon Bridge.
High Resolution TIF(14 MB)
|

Hoover Dam Canyon Bridge
(looking west)
Edward Kraemer & Sons placing formwork and reinforcing steel for the
construction of the Pier 2 columns at the Hoover Dam Canyon Bridge
(Structure H-2700).
High Resolution TIF (14 MB)
|

Nevada Interchange
(looking northwest)
View of Nevada Interchange, associated ramps, Gold Strike Canyon
access road, and the Hoover Dam Interchange Bridge (Structure
H-2699).
Center: View of the completed double 8 x 5 box culvert and
beginning of MSE Wall 2.
High Resolution TIF (14 MB) |
Return to top of page |
Images from November 2004
Nevada Approach: Getting started on the Canyon
Bridge
& making progress on the Nevada Interchange... |

Hoover Dam Canyon Bridge
(looking southwest)
Lower left: View of the completed Pier 1 bent cap of
the Hoover Dam Canyon Bridge
(Structure H-2700).
Center: View of excavation of Abutment 1 for the Hoover Dam
Canyon Bridge (Structure H-2700) and roadway alignment from US 93 Station
45+72 to Station 65+64.
High Resolution TIF (14 MB)
|

Lower Portal Access Road Overpass
(looking west)
Foreground: Edward Kraemer & Sons constructing
falsework for the construction of the Hoover Dam
Lower Portal Access Road Overpass
(Structure H-2701).
Background: KLB Construction placing embankment
fill from US 93 Station
85+00 to Station 94+76.
High Resolution TIF (14 MB) |

Nevada Interchange/Hoover Dam Interchange Bridge
Looking to the West - A view of the Nevada
Interchange and associated ramps, including the
Hoover Dam Interchange Bridge (Structure H-2699).
High Resolution TIF (14 MB)
|

Hoover Dam Interchange Bridge
Looking Southeast at Edward Kraemer & Sons placing concrete for the
stems/soffit on the Hoover Dam Interchange Bridge (Structure
H-2699).
High Resolution TIF (14 MB) |
Return to top of page |
Images from October 2004
Earthwork = 75% Complete and
Structures = 30% Complete! |

Looking to the South
Foreground: Completed abutment 1 of the Hoover Dam Lower
Portal Access Road Overpass
(Structure H-2701).
Background: View of placed embankment fill from US 93 Station
85+00 to 94+76.
High Resolution TIF (14 MB)
|

Looking West.
View of Nevada Interchange and associated ramps, including the
Hoover Dam Interchange Bridge
(Structure H-2699).
High Resolution TIF (14 MB) |

View from abutment 1.
View of the completed deck of the Hoover Dam BOR Warehouse Old US 93
Overpass (Structure H-2702).
High Resolution TIF (14 MB) |
Return to top of page |
Images from September 2004
Nevada Approach:
Construction Continues... |

Constructing Formwork
Edward Kraemer and Sons constructing formwork for the superstructure
of the Hoover Dam Interchange Bridge (Structure H-2699).
High Resolution TIF (14 MB)
|

Constructing Abutment #1
View of the formwork for the construction of abutment 1of the Hoover
Dam Lower Portal Access Road Overpass (Structure H-2701).
High Resolution TIF (14 MB) |

Prepping for drilling
Yenter Companies personnel proportioning blasting agent in
preparation of loading drilled blast holes.
High Resolution TIF (14 MB)
|

Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702)Foreground: Constructed Section of bridge deck covered
with cure blankets.
Background: Bidwell Paving machine in preparation of concrete
placement for next deck segment.
High Resolution TIF (14 MB) |

Stepped excavation
View of stepped excavation for the construction of Mechanically
Stabilized Earth
(MSE) Wall No 4 from US 93 Station 165+85 to 170+20, 95' left of
centerline.
High Resolution TIF (14 MB) |
Return to top of page |
Images from August 2004
US 93 Lower Portal Access Road
Overpass Taking Shape |

Drilling at Station 72+00
Yenter Companies drilling blast holes
near US 93 Station 72+00.
High Resolution TIF (14 MB) |

Wildlife Underpass
View of the newly constructed wildlife underpass structure at US 93
(station 28+60) prior to backfilling.
High Resolution TIF (14 MB) |

Installing RebarForeground: Reinforcing Steel being placed for
construction of Abutment #1 of the Lower Portal Access Road
Overpass.
Background: Embankment fill from US 93, Station 85+00 to
94+76.
High Resolution TIF (14 MB)
|
Return to top of page |
Images from July 2004
Taking Shape...the new alignment of US 93 |

10' x 5' Reinforced Concrete Box Culvert.
Inlet at US 93 Station 114+77 prior to
completion of backfilling
operations.
High Resolution TIF (14 MB)
|

Aerial view of the proposed
Colorado River Bridge site.
Foreground: KLB Construction excavating for rock containment
ditch from US 93 Station 177+00 to Station 170+00.
Background: Beginning of Arizona Approach roadway alignment
at the canyon edge.
High Resolution TIF (14 MB)
|

Hoover Dam BOR Warehouse Edward Kraemer & Sons crews
stripping formwork from the Span 2 & 3 girders and
constructing lost decking for Span 1 on the Hoover Dam BOR Warehouse
Old US 93 Overpass (Structure H-2702). High Resolution
TIF (14 MB) |

View of alignment of the future Hoover Dam Canyon Bridge
(Structure H-2700) from US 93, Station 65+88 to Station 70+51.
Bottom Right: KLB Construction excavating for the roadway
alignment from US 93 Station 73+00 to 65+00.
Top Left:. KLB Construction excavating blasted rock
material near US 93, Station 72+00.
High Resolution TIF (14 MB) |

View of the newly constructed US 93 alignment from beginning of
the Project (Station 26+93) to Station 65+00.
Center Left: Edward Kraemer & Sons constructing Abutments 1 &
2 for the Hoover Dam Interchange Bridge (Structure H-2699).
High Resolution
TIF (14 MB) |
Return to top of page |
Images from June 2004
Embankment work on the Nevada Approach nearing completion. |

Overall view of project.
Foreground: KLB Construction excavating and hauling blasted
rock material from US 93
Station 62+00 and placing it to construct roadway embankment near
Station 55+00.
Background: Yenter Companies drilling blast pattern for rock
excavation from US 93
Station 72+00 to 73+50; right of centerline.
High Resolution TIF (14 MB)
|

Hoover Dam BOR Warehouse Edward Kraemer & Sons crews
stripping formwork from the girders of the Hoover Dam BOR Warehouse
Old US 93 Overpass (Structure H-2702); Span 1.. High Resolution
TIF (14 MB) |

KLB Construction. KLB Construction excavating blasted rock
material near US93 Station 72+00 while a laborer applies water for
dust suppression. In the background, Yenter Companies
positioning rock drills in preparation to drill out a blast pattern.
High Resolution TIF (14 MB) |
Excavation and hauling continuesKLB Construction
excavating and hauling blasted rock material from US 93 Station
174+00 and placing it to construct roadway embankment near Station
168+00. High Resolution TIF (14 MB) |
Return to top of page |
Images from May 2004
Bridge abutments take shape while embankment work continues on US
93... |

Looking Southwest - View 1 |

Looking Southwest - View 2
|
Foreground: The reinforcing steel cages of the drilled shaft
at Abutment 1 of the Hoover Dam Interchange Bridge (Structure
H-2699)
Background: KLB Construction placing excavated material to
construct the roadway embankment from US 93 station 85+00 to 93+00. |
High Resolution TIF (View 1) (14 MB)
|
High Resolution TIF (View 2) (14 MB)
|
 Close-up
of the steel cages at Abutment 1 of the Hoover Dam Interchange
Bridge.
High Resolution TIF (14 MB) |
|

View of the future US 93 alignment (looking northeast). Foreground:
The reinforcing steel cages of the drilled shaft at Abutment 1
of the Hoover Dam Lower Portal Access Road Overpass
(Structure H-2701)
Background: Edward Kraemer & Sons forming the superstructure
of the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure
H-2702).
High Resolution TIF (14 MB) |

Looking SoutheastKLB Construction excavating and hauling
blasted rock material from US 93 Station 174+00 and placing it to
construct roadway embankment near Station 168+00.
High Resolution TIF(14 MB) |
Return to top of page |
Images from April 2004
Structures on the Nevada Approach
start to take shape. |

Bottom:
KLB Construction excavating and hauling blasted
embankment material from US 93 (Stations 71+00 - 74+00)
Top: View of Hoover Dam Interchange area along with
associated ramps adn the Double 8' x 5' reinforced concrete box
culvert located in the Gold Strike Canyon access road at Station
17+76.
High Resolution
TIF (14 MB) |

Left Side: Case Foundation lifting and placing the
reinforcing steel cage for drilled shaft S3, Abutment 1 for the
Hoover Dam Interchange Bridge (Structure H-2699)
High Resolution TIF (14 MB) |

View of completed double 8' x 5' reinforced
concrete box culvert prior to backfilling. Location: Gold
Strike Canyon access road, Station 17+76.
High Resolution
TIF (14 MB) |

Edward Kraemer & Sons constructing formwork and placing reinforcing
steel for the soffit and pier 1 diaphragm on the Hoover Dam BOR
Warehouse Old US 93 Overpass Bridge (Structure H-2702).
High Resolution TIF (14 MB) |
Return to top of page |
Images from March 2004
Progress on the
Nevada Approach |

Excavating blasted material for the construction
of US 93 near Station 80+00. Material is being hauled and
placed to construct embankment from Station 87+00 to 93+00.
High Resolution TIF (14 MB) |

KLB Construction hauling and placing
material to construct embankment from
US 93 Station 87+00 to 93+00.
High Resolution TIF (14 MB) |

Right side of this picture
shows KLB Construction constructing embankment for the
traffic interchange from approximate US 93 Stations 35+00 to 50+00.
Left side of the picture shows Edward
Kraemer & Sons setting formwork for the walls of the double 8' x 5'
box culvert at Gold Strike Canyon access road Station 17+76.
High Resolution TIF (14 MB) |

Installing 36" CMP for drainage system
at US 93 Station 80+40.
High Resolution TIF (14 MB) |
Return to top of page |
Images from February 2004
|

This photo shows the temporary haul road and the
embankment construction for the future US 93 alignment.
(Stations 75+00 - 94+50) High
Resolution TIF (14 MB) |

Station 79+00 to Station 94+50 of the temporary
haul road. This view also shows construction of Abutment 1 of
the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702)
at US 93. (Station 103+63.73) High
Resolution TIF (14 MB) |

View of the proposed Colorado River Bridge
alignment, taken from US 93, Station 177+50. This view is
looking from Abutment 1 on the Nevada side to Abutment 2 on the
Arizona. High
Resolution TIF (14 MB) |

View of the future US
93 alignment, from Station 72+00.
High Resolution
TIF (14 MB) |
Return to top of page |
Images from
January
2004 |

Embankment construction on the Mainline
Station 42+50 - Station 50+00
(Looking East)
High Resolution TIF (14 MB) |
Return to top of page |
Images November 2003
Pre-construction on the Nevada Approach |

TIOP
(Looking back on line)
High Resolution TIF (24 MB) |

Beginning of Project
(Looking ahead on line)
High Resolution TIF (24 MB) |

Gold Strike Canyon, MSE #1 & #2
High Resolution TIF (24 MB) |
Return to top of page |
|