Construction Photo Album – Nevada ApproachClick on any thumbnail to view an enlarged version of that photo. Please note that you will need to use the Back button on your browser to return to this page. If you prefer a higher resolution image (300 dpi or more), you can also download these from our site using the High Resolution link located below each thumbnail. Please note that these higher resolution images (which are provided in TIF format) will take longer to download. |
|||
|
Quick Jump: |
|||
| December 2004 | September 2004 | June 2004 | March 2004 |
| November 2004 | August 2004 | May 2004 | February 2004 |
| October 2004 | July 2004 | April 2004 | January 2004 |
| November 2003 | |||
|
Images from December 2004 The Canyon Bridge takes shape… |
|||
![]() Nevada Interchange (looking west) View of the Nevada Interchange and associated ramps, including the Hoover Dam Interchange Bridge (Structure H-2699). High Resolution TIF (14 MB) |
![]() Hoover Dam Canyon Bridge (looking east)
Foreground: Edward Kraemer & Sons constructing High Resolution TIF(14 MB) |
||
![]() Hoover Dam Canyon Bridge (looking west) Edward Kraemer & Sons placing formwork and reinforcing steel for the construction of the Pier 2 columns at the Hoover Dam Canyon Bridge (Structure H-2700). High Resolution TIF (14 MB) |
![]() Nevada Interchange (looking northwest)
View of Nevada Interchange, associated ramps, Gold Strike Canyon
access road, and the Hoover Dam Interchange Bridge (Structure
H-2699). High Resolution TIF (14 MB) |
||
|
Images from November 2004 Nevada Approach: Getting started on the Canyon Bridge & making progress on the Nevada Interchange… |
|||
|
Lower left: View of the completed Pier 1 bent cap of High Resolution TIF (14 MB) |
Foreground: Edward Kraemer & Sons constructing High Resolution TIF (14 MB) |
||
|
Looking to the West – A view of the Nevada High Resolution TIF (14 MB) |
Looking Southeast at Edward Kraemer & Sons placing concrete for the stems/soffit on the Hoover Dam Interchange Bridge (Structure H-2699). High Resolution TIF (14 MB) |
||
|
Images from October 2004 Earthwork = 75% Complete and Structures = 30% Complete! |
|||
![]() Looking to the South
Foreground: Completed abutment 1 of the Hoover Dam Lower
Portal Access Road Overpass High Resolution TIF (14 MB) |
![]() Looking West.
View of Nevada Interchange and associated ramps, including the
Hoover Dam Interchange Bridge High Resolution TIF (14 MB) |
||
![]() View from abutment 1. View of the completed deck of the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702). High Resolution TIF (14 MB) |
|||
|
Images from September 2004 Nevada Approach: Construction Continues… |
|||
|
Edward Kraemer and Sons constructing formwork for the superstructure of the Hoover Dam Interchange Bridge (Structure H-2699). High Resolution TIF (14 MB) |
View of the formwork for the construction of abutment 1of the Hoover Dam Lower Portal Access Road Overpass (Structure H-2701). High Resolution TIF (14 MB) |
||
![]() Prepping for drilling Yenter Companies personnel proportioning blasting agent in preparation of loading drilled blast holes. High Resolution TIF (14 MB) |
![]() Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702) Foreground: Constructed Section of bridge deck covered
with cure blankets. High Resolution TIF (14 MB) |
||
![]() Stepped excavation
View of stepped excavation for the construction of Mechanically
Stabilized Earth High Resolution TIF (14 MB) |
|||
|
Images from August 2004 US 93 Lower Portal Access Road Overpass Taking Shape |
|||
|
Yenter Companies drilling blast holes High Resolution TIF (14 MB) |
|||
![]() Wildlife Underpass View of the newly constructed wildlife underpass structure at US 93 (station 28+60) prior to backfilling. High Resolution TIF (14 MB) |
![]() Installing Rebar Foreground: Reinforcing Steel being placed for
construction of Abutment #1 of the Lower Portal Access Road
Overpass. High Resolution TIF (14 MB) |
||
|
Images from July 2004 Taking Shape…the new alignment of US 93 |
|||
![]() 10′ x 5′ Reinforced Concrete Box Culvert.
Inlet at US 93 Station 114+77 prior to High Resolution TIF (14 MB) |
![]() Aerial view of the proposed Colorado River Bridge site.
Foreground: KLB Construction excavating for rock containment
ditch from US 93 Station 177+00 to Station 170+00. High Resolution TIF (14 MB) |
||
|
Edward Kraemer & Sons crews stripping formwork from the Span 2 & 3 girders and constructing lost decking for Span 1 on the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702). High Resolution TIF (14 MB) |
Bottom Right: KLB Construction excavating for the roadway
alignment from US 93 Station 73+00 to 65+00. High Resolution TIF (14 MB) |
||
![]() View of the newly constructed US 93 alignment from beginning of the Project (Station 26+93) to Station 65+00.
Center Left: Edward Kraemer & Sons constructing Abutments 1 &
2 for the Hoover Dam Interchange Bridge (Structure H-2699). |
|||
|
Images from June 2004 Embankment work on the Nevada Approach nearing completion. |
|||
|
Foreground: KLB Construction excavating and hauling blasted
rock material from US 93 High Resolution TIF (14 MB) |
|||
|
Edward Kraemer & Sons crews stripping formwork from the girders of the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702); Span 1.. High Resolution TIF (14 MB) |
KLB Construction excavating blasted rock material near US93 Station 72+00 while a laborer applies water for dust suppression. In the background, Yenter Companies positioning rock drills in preparation to drill out a blast pattern. High Resolution TIF (14 MB) |
||
Excavation and hauling continues KLB Construction excavating and hauling blasted rock material from US 93 Station 174+00 and placing it to construct roadway embankment near Station 168+00. High Resolution TIF (14 MB) |
|||
|
Images from May 2004 Bridge abutments take shape while embankment work continues on US 93… |
|||
![]() Looking Southwest – View 1 |
|||
|
Foreground: The reinforcing steel cages of the drilled shaft at Abutment 1 of the Hoover Dam Interchange Bridge (Structure H-2699) Background: KLB Construction placing excavated material to construct the roadway embankment from US 93 station 85+00 to 93+00. |
|||
|
High Resolution TIF (View 1) (14 MB) |
High Resolution TIF (View 2) (14 MB) | ||
![]() Close-up
of the steel cages at Abutment 1 of the Hoover Dam Interchange
Bridge. |
|||
![]() View of the future US 93 alignment (looking northeast). Foreground:
The reinforcing steel cages of the drilled shaft at Abutment 1
of the Hoover Dam Lower Portal Access Road Overpass
(Structure H-2701) |
![]() Looking Southeast KLB Construction excavating and hauling blasted rock material from US 93 Station 174+00 and placing it to construct roadway embankment near Station 168+00. High Resolution TIF(14 MB) |
||
|
Images from April 2004 Structures on the Nevada Approach start to take shape. |
|||
![]() Bottom: KLB Construction excavating and hauling blasted embankment material from US 93 (Stations 71+00 – 74+00) Top: View of Hoover Dam Interchange area along with associated ramps adn the Double 8′ x 5′ reinforced concrete box culvert located in the Gold Strike Canyon access road at Station 17+76. High Resolution TIF (14 MB) |
![]() Left Side: Case Foundation lifting and placing the reinforcing steel cage for drilled shaft S3, Abutment 1 for the Hoover Dam Interchange Bridge (Structure H-2699) High Resolution TIF (14 MB) |
||
![]() View of completed double 8′ x 5′ reinforced
concrete box culvert prior to backfilling. Location: Gold
Strike Canyon access road, Station 17+76. |
![]() Edward Kraemer & Sons constructing formwork and placing reinforcing steel for the soffit and pier 1 diaphragm on the Hoover Dam BOR Warehouse Old US 93 Overpass Bridge (Structure H-2702). High Resolution TIF (14 MB) |
||
|
Images from March 2004 Progress on the Nevada Approach |
|||
![]() Excavating blasted material for the construction of US 93 near Station 80+00. Material is being hauled and placed to construct embankment from Station 87+00 to 93+00. High Resolution TIF (14 MB) |
![]() KLB Construction hauling and placing material to construct embankment from US 93 Station 87+00 to 93+00. High Resolution TIF (14 MB) |
||
![]() Right side of this picture shows KLB Construction constructing embankment for the traffic interchange from approximate US 93 Stations 35+00 to 50+00. Left side of the picture shows Edward Kraemer & Sons setting formwork for the walls of the double 8′ x 5′ box culvert at Gold Strike Canyon access road Station 17+76. High Resolution TIF (14 MB) |
![]() Installing 36" CMP for drainage system at US 93 Station 80+40. High Resolution TIF (14 MB) |
||
|
Images from February 2004 |
|||
![]() This photo shows the temporary haul road and the embankment construction for the future US 93 alignment. (Stations 75+00 – 94+50) High Resolution TIF (14 MB) |
![]() Station 79+00 to Station 94+50 of the temporary haul road. This view also shows construction of Abutment 1 of the Hoover Dam BOR Warehouse Old US 93 Overpass (Structure H-2702) at US 93. (Station 103+63.73) High Resolution TIF (14 MB) |
||
![]() View of the proposed Colorado River Bridge alignment, taken from US 93, Station 177+50. This view is looking from Abutment 1 on the Nevada side to Abutment 2 on the Arizona. High Resolution TIF (14 MB) |
![]() View of the future US 93 alignment, from Station 72+00. High Resolution TIF (14 MB) |
||
|
Images from January 2004 |
|||
|
Embankment construction on the Mainline Station 42+50 – Station 50+00 (Looking East) High Resolution TIF (14 MB) |
|||
|
Images November 2003 Pre-construction on the Nevada Approach |
|||
![]() TIOP (Looking back on line) High Resolution TIF (24 MB) |
![]() Beginning of Project (Looking ahead on line) High Resolution TIF (24 MB) |
||
![]() Gold Strike Canyon, MSE #1 & #2 High Resolution TIF (24 MB) |
|||